Overview
H&S completed the preliminary, right of way, and final design of Green Park Road. In addition to pavement reconstruction, improvements included a multi-use bicycle/pedestrian trail, ADA/PROWAG compliant curb ramps, a hydrodynamic separator (HDS) and amended soils for water quality, and storm sewers. The multi-use trail connects Officer Blake C. Snyder Memorial Park to Grant’s Trail.
Additionally, Horner & Shifrin provided construction services for the complete removal and replacement of a 0.50 mile stretch of Green Park Road. The new typical section included an 8’ shared use path that connected to popular Grant’s Trail in south St Louis County. This project required numerous construction stages, and traffic handling meetings, to keep the motoring public moving throughout construction with a sizeable 9,000 ADT on this road. The road section was 10.5” HMA on 6” Base Rock with Enclosed Drainage, Curb & Guttering, & Fully ADA Compliant New Construction. This project was completed within budget and traffic was on the new pavement section months ahead of the contract completion date.